安排执行施工工作的时间表。安排资源以签订新资产或替换资产的合同。如果需要,重新安排或重新设计资产。
Arranging a timetable for which to perform construction work. Schedule resources to contract assets for new or replacement assets. Reschedule or redesign assets if needed.
|
|
名称(英文) | Schedule and perform construction work |
指标可用 | N |
PCF ID | 19229 |
级别 ID | 10.2.3 |