拓宽线级规划。指定所有单独的生产过程,以及时间和持续时间,以制定跟踪整个过程和可能发生的任何偏差的工作计划。
Broadening the line-level plan. Specify all the individual production processes, along with the timing and the duration to come up with a working schedule that tracks the whole process and any deviations that might occur.
|
|
指标可用 | N |
名称(英文) | Generate detailed schedule |
PCF ID | 10307 |
级别 ID | 4.3.1.3 |